Tarihçe
- 28.05.2012 Commencement of the construction of the center.
- 10.10.2012 Installation of HotCells was initiated.
- 25.11.2012 Installation of HotCells was completed.
- 15.02.2013 Installation of the production system was initiated.
- 28.03.2013 Installation of the production system was completed.
- 28.03.2013 an audit was carried out by the Turkish Atomic Energy Authority and within this context a test production was realized with radioactive raw material.
- 11.04.2013 The Certificate was obtained from Turkish Atomic Energy Authority.
- 22.08.2013 Ministry of Health Production Area License and GMP Certificate were obtained.
- March 2014: Ministry of Health Product Licenses was received.